this post was submitted on 13 May 2026
139 points (99.3% liked)

Technology

84569 readers
4078 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related news or articles.
  3. Be excellent to each other!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
  9. Check for duplicates before posting, duplicates may be removed
  10. Accounts 7 days and younger will have their posts automatically removed.

Approved Bots


founded 2 years ago
MODERATORS
 

The Stratos artificial intelligence datacenter footprint will cover more than 40,000 acres (62 sq miles) over three sites in Box Elder county in north-western Utah. The facility will require about 9GW of power, which is more than the entire state of Utah currently consumes, and suck up a significant amount of water in an area that has been hit by severe drought in recent years.

you are viewing a single comment's thread
view the rest of the comments
[–] The_Picard_Maneuver@lemmy.world 17 points 2 hours ago (2 children)

That's long-term thinking. I assume it's like a ponzi scheme: everyone who puts money into something like this thinks they'll cash out before the problems occur.

Why do I feel like the ones left holding the bag are going to be the taxpayers/residents somehow?

[–] crunchy@lemmy.dbzer0.com 1 points 25 minutes ago

Because our tax dollars have been bankrolling this whole thing for a while now.

[–] crusa187@lemmy.ml 4 points 1 hour ago

~~E Pluribus Unum~~

Privatize the gains, Socialize the losses.