444
this post was submitted on 04 Jul 2025
444 points (97.8% liked)
Technology
72360 readers
2987 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related news or articles.
- Be excellent to each other!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
- Check for duplicates before posting, duplicates may be removed
- Accounts 7 days and younger will have their posts automatically removed.
Approved Bots
founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
I think Lazard's LCOE methodology looks at the entire life cycle of the power plant, specific to that power plant. So they amortize solar startup/decommissioning costs across the 20 year life cycle of solar, but when calculating LCOE for nuclear, they spread the costs across the 80 year life cycle of a nuclear plant.
Nuclear is just really, really expensive. Even if plants required no operating costs, the up front costs are so high that it represents a significant portion of the overall operating costs for any given year.
The Vogtle debacle in Georgia cost $35 billion to add ~~2 MW~~ 2GW (edit to fix error) of capacity. They're now projecting that over the entire 75 year lifespan the cost of the electricity will come out to be about $0.17 to $0.18 per kilowatt hour.
Vogtle’s numbers are incredibly biased considering they made an entire design and then had to redo it halfway through that’s not a realistic cost that can be expected for future projects. We also have vogtles design be approved now so that new plants can be built for a fraction of the cost. Also where did you see they did amortization of solar?
I'm just familiar with Lazard's LCOE methodology. The linked paper talks about LCOE, so that's just how that particular cost analysis works.
2gw, but yes, before any operational/maintenance costs that is $17.5/watt. Solar is under $1/watt, and sunny AF.