this post was submitted on 21 Aug 2026
170 points (99.4% liked)

memes

23901 readers
422 users here now

dank memes

Rules:

  1. All posts must be memes and follow a general meme setup.

  2. No unedited webcomics.

  3. Someone saying something funny or cringe on twitter/tumblr/reddit/etc. is not a meme. Post that stuff in /c/slop

  4. Va*sh posting is haram and will be removed.

  5. Follow the code of conduct.

  6. Tag OC at the end of your title and we'll probably pin it for a while if we see it.

  7. Recent reposts might be removed.

  8. Tagging OC with the hexbear watermark is praxis.

  9. No anti-natalism memes. See: Eco-fascism Primer

founded 5 years ago
MODERATORS
 
top 7 comments
sorted by: hot top controversial new old
[–] KnilAdlez@hexbear.net 21 points 1 day ago (2 children)

I never thought about it but there was probably a lot of meetings with people about logistics and what the pharaoh wants and needs for the afterlife. Construction managers, priests of Anubis, doctors, etc. Probably all had to meet relatively often.

[–] Runcible@hexbear.net 18 points 1 day ago* (last edited 1 day ago) (3 children)

The construction of the pyramids is (apparently) the oldest recorded occurrence of calibration where people had to get their cubit measuring sticks/rules verified on a regular basis. I forget but I think the cubit was defined of the length of the pharaoh's forearm (like elbow to ~~base of thumb~~ tip of middle finger)

edit: fluff article that touches on this, didn't want to chase down more: https://www.hbkworld.com/en/knowledge/resource-center/articles/egyptian-cubit

[–] KnilAdlez@hexbear.net 21 points 1 day ago (1 children)

Pharaoh babyarms wondering why his pyramid is smaller than all the other ones

[–] DornerStan@lemmygrad.ml 11 points 1 day ago

lmao send this bit idea to Gary Larson

[–] huf@hexbear.net 8 points 1 day ago

better build quality than the vasa in 1626

[–] Lussy@hexbear.net 6 points 1 day ago* (last edited 1 day ago)

First example of design bid build project delivery except instead of bid it’s subjugate

[–] TreadOnMe@hexbear.net 9 points 23 hours ago

As well, these projects sometimes literally took decades to complete. Lots of time for meetings to actually do larger project alignment and make sure everything is going more or less according to plan. As well, often the punishment for screwing things up from a recording standpoint would be like a finger, so diligence was the name of the game.

Part of the issue now is the product cycles are so short you barely have time to address all the facets of a problem before a larger one rears its head. We just aren't able to take the time to learn and teach people how to do things because the market is already fully developed.