this post was submitted on 18 Apr 2025
31 points (94.3% liked)
Aotearoa / New Zealand
1806 readers
11 users here now
Kia ora and welcome to !newzealand, a place to share and discuss anything about Aotearoa in general
- For politics , please use !politics@lemmy.nz
- Shitposts, circlejerks, memes, and non-NZ topics belong in !offtopic@lemmy.nz
- If you need help using Lemmy.nz, go to !support@lemmy.nz
- NZ regional and special interest communities
Rules:
FAQ ~ NZ Community List ~ Join Matrix chatroom
Banner image by Bernard Spragg
Got an idea for next month's banner?
founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
I eventually found this site: https://livinghouse.nz/
It has this cost breakdown:
There's also this more detailed breakdown: https://livinghouse.nz/#living-house-cost-breakdown
It seems it does have insulation, as they allocate $15k for the cost of insulation including delivery.
Heating is via a heatpump (with power partly provided from the solar). The place is only 85sqm so it should be enough to keep it cosy, since it will have to meet modern insulation requirements. It also uses a heat pump hot water system which should save on the power bills.
Yeah I generally avoid them. Lucky thing is that the site explains that they are not builders just architects, you buy the plans from them then find a builder to build it. They have agreements with certain suppliers to bring down the costs but presumably you can decide to buy different appliances.
Some oddly specific numbers there for the estimates. Would like to see some R values for the insulation, but $15k does buy a lot of good insulation, so its promising. (Edit: just saw your other reply, would have to see what the builders actually put in to know more)
I wonder how skilled one needs to be to assemble these houses? If the instructions are good, and its not too hard, could save some more money on the labor side of things? You can do your own electrical work in NZ right?
It seems you can do a lot yourself but you wouldn't be able to avoid an electrician completely. The thing that stands out to me is that you can't connect the house to the grid, and you can't connect new subcircuits. So you can replace existing hot points, but if you install new ones then you can run the cabling but need to have an electrician actually connect it to the power, and need the work to be inspected.
They talk about cutting the electrician time down to a few days for this design, I guess you could make it one day if you do the leg work yourself and just have them there for the inspection and connection.
For assembling, it seems like you should be able to do it with a few friends so long as you have a loader crane type thing. I presume you can hire those but I'm not sure what the class requirements are to drive them.