this post was submitted on 05 Jul 2026
47 points (100.0% liked)

Home Improvement

14745 readers
87 users here now

Home Improvement

founded 3 years ago
MODERATORS
 

After an eternity using a laser and making sure we have a slope of 1cm per meter we now have the base layer done :) If I understand correctly I now need to rent a machine to compact everything tightly before putting the visqueen layer and the armature.

you are viewing a single comment's thread
view the rest of the comments
[–] a4ng3l@lemmy.world 5 points 1 hour ago (2 children)

I have foreseen some kind of drainage around with a gravel ditch that leads to our water egress thingy. Though our piece of land usually drains quite well unless it pours for weeks.

[–] tyler@programming.dev 1 points 20 minutes ago (1 children)
[–] a4ng3l@lemmy.world 1 points 11 minutes ago

I think an actual French drain requires some kind of pierced tubing running along the drain. I don’t think I will bother with that.

[–] TheReturnOfPEB@reddthat.com 3 points 1 hour ago

That's awesome. Thank you for sharing it educates as well as inspires.