this post was submitted on 05 Jul 2026
32 points (100.0% liked)

Home Improvement

14745 readers
60 users here now

Home Improvement

founded 3 years ago
MODERATORS
 

After an eternity using a laser and making sure we have a slope of 1cm per meter we now have the base layer done :) If I understand correctly I now need to rent a machine to compact everything tightly before putting the visqueen layer and the armature.

top 5 comments
sorted by: hot top controversial new old
[–] MacAttak8@lemmy.world 9 points 41 minutes ago (1 children)

You will want to make sure the slope remains after compacting.

[–] a4ng3l@lemmy.world 5 points 37 minutes ago

I’m taking a mental note of that. More laser fun yeahhhh 🫩

[–] TheReturnOfPEB@reddthat.com 4 points 51 minutes ago* (last edited 50 minutes ago) (1 children)

Is the 1 cm per meter put the draining water somewhere that can take more water ? I suppose I've been seeing a few posts about backyards having standing water during rainstorms and I am somewhat intrigued about the topic atm.

[–] a4ng3l@lemmy.world 5 points 38 minutes ago (1 children)

I have foreseen some kind of drainage around with a gravel ditch that leads to our water egress thingy. Though our piece of land usually drains quite well unless it pours for weeks.

[–] TheReturnOfPEB@reddthat.com 3 points 24 minutes ago

That's awesome. Thank you for sharing it educates as well as inspires.