Fuck Cars
A place to discuss problems of car centric infrastructure or how it hurts us all. Let's explore the bad world of Cars!
Rules
1. Be Civil
You may not agree on ideas, but please do not be needlessly rude or insulting to other people in this community.
2. No hate speech
Don't discriminate or disparage people on the basis of sex, gender, race, ethnicity, nationality, religion, or sexuality.
3. Don't harass people
Don't follow people you disagree with into multiple threads or into PMs to insult, disparage, or otherwise attack them. And certainly don't doxx any non-public figures.
4. Stay on topic
This community is about cars, their externalities in society, car-dependency, and solutions to these.
5. No reposts
Do not repost content that has already been posted in this community.
Moderator discretion will be used to judge reports with regard to the above rules.
Posting Guidelines
In the absence of a flair system on lemmy yet, let’s try to make it easier to scan through posts by type in here by using tags:
- [meta] for discussions/suggestions about this community itself
- [article] for news articles
- [blog] for any blog-style content
- [video] for video resources
- [academic] for academic studies and sources
- [discussion] for text post questions, rants, and/or discussions
- [meme] for memes
- [image] for any non-meme images
- [misc] for anything that doesn’t fall cleanly into any of the other categories
Recommended communities:
view the rest of the comments
In the end the maintenance cost for maglev vs bullet trains are about the same. Bullet trains focus more on mechanical maintenance of the track and wheels. While the maintenance of maglev is typically more technical, it requires constant recalibration of the electronics and constant monitoring for alignment.
Traditional steel on rail is actually more reliable in practice. Theoretically the basic mechanics of maglev are more reliable, but in practice they tend to suffer from longer delays when they do fail. This is mostly because the repairs/maintenance for traditional rail can be done by just about anyone, where maglevs tend to be locked in by a single vendor contract.
They are theoretically faster, but in practice the speed of trains are most often governed not by the limitations of the trains themselves, but instead are limited by the surrounding infrastructure and terrain.
The cruising speed of railed bullet trains are around 200mph, while the cruising speeds of maglev is around 265mph. Maglevs have gone significantly faster around 375mph, but thats not really a realistic expectation for daily operations.
Imo both are extremely cool, but traditional rail is just a lot more practical for a plethora of reasons. The most important being that the installation and operational cost are just a lot more realistic than maglev. There's a reason there's only a total of 37 miles of maglev in operation today compared to over 30k miles of high-speed rail.
Remember that the TGV has the high speed record for rail, at 574kmh or 356mph
Yeah, but it's not something you would ever see in operation. The V150 trial had special modified and powered cars running on the most favorable railway conditions possible. Plus, running over 200mph on steel starts to create enough friction to damage the wheels and rail.