397
this post was submitted on 25 Nov 2026
397 points (97.1% liked)
Technology
90067 readers
3741 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related news or articles.
- Be excellent to each other!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
- Check for duplicates before posting, duplicates may be removed
- Accounts 7 days and younger will have their posts automatically removed.
Approved Bots
founded 3 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
ya, profitability is a whole other matter if that's part of feasibility. Not only does it need to physically work as expected, but it also has to be at a reasonable cost AND earn enough money from people actually wanting to use it, and who the fuck knows if that will ever be possible.
I did write this other comment about Kessler though
https://lemmy.world/post/54847200/27050416
How is profitability not a part of feasibility? Why do you think so many new technologies don't make it out of the lab?
A lot of people don't even think its physically possible at all. They go on and on about how they'll never be able to cool the hardware etc.
E.g This comment on this post.
A lot of people in other threads seem to often think that they want to build this massive single datacenter instead of it being a large constellation of smaller dishes like starlink, and think it's impossible because of that.
Personally, I think they'll be able to design a dish that costs a reasonable amount, and launch it at a reasonable cost, but the actual demand for the product won't be sufficient for anywhere near the scale they want or need to make it profitable.
Something like Starlink has large ongoing demand, I don't think these dishes will.
Yeah, but why are you conflating feasible with possible? And I expect deploying solar panels and their connectors are way easier than deploying radiators and their connectors. Wire is far more forgiving than pipes are.
My bad, I totally didn't answer that.
Just because I don't personally think there is enough demand to make it work, doesn't mean there isn't, nor that they can't somehow drum up future demand. If the dishes are sitting idle too long, that's why it'll likely fail IMO.
So I do think it's feasible in that sense, but we won't know until they do it.
Re: Pipes. It'll be more complicated for sure, but so is catching an orbital rocket and ship between 2 chop sticks, so they do have some pretty good engineering capabilities there, so I wouldn't put that problem past them.
Edit: essentially, I think theyll figure out the hardware and launch it, and if the hardware can reach some threshold % of usage, it could work. I dont think beyond some initial test dishes and time to optimize that even at full usage at a reasonable price, it would still be unprofitable. Im not personally sure theyll reach that %.