Yes, and that's before muxing!
I need only 75 GHz of spectrum to send 400 Gbit/s through our country. We've currently got a link running between Zürich and Lugano (two amplifier sites in between, before and after the alps), and I've got 4400 GHz of usable spectrum with our currently deployed system, so if we needed it and spent like two million dollars we could deploy 23.2 Tbit/s within months, using just our normal commercial stuff, on a single fiber pair.
Wow interesting! Thanks for checking the label!