this post was submitted on 03 Jun 2026
420 points (97.9% liked)
Technology
85136 readers
4277 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related news or articles.
- Be excellent to each other!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
- Check for duplicates before posting, duplicates may be removed
- Accounts 7 days and younger will have their posts automatically removed.
Approved Bots
founded 3 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
FYI. Hydro power has similar capacity and start up times
Yeah, the downside of hydro though is that you need to have a fitting space to build it. You can't just excavate a random field somewhere and plonk a hydro dam right there.
In most places all easy spots for hydro are already taken.
Not quite - only the biggest hydro stations can generate a gigawatt or more, and their startup time is like 10 minutes.
This project is only 500 MW here
https://www.pv-magazine.de/2024/09/20/flexbase-plant-500-megawatt-redox-flow-speicher-in-der-schweiz/
And other places say 800 MW
Both of which are comparable to large hydro.
Modern pumped hydro has a ramp up in the 10s of seconds range.
Anyway. Same ballpark in terms of power.
I must have got the 1.2GW from some comment.