this post was submitted on 13 Sep 2026
15 points (85.7% liked)

Technology

43258 readers
153 users here now

This is the official technology community of Lemmy.ml for all news related to creation and use of technology, and to facilitate civil, meaningful discussion around it.


Ask in DM before posting product reviews or ads. All such posts otherwise are subject to removal.


Rules:

1: All Lemmy rules apply

2: Do not post low effort posts

3: NEVER post naziped*gore stuff

4: Always post article URLs or their archived version URLs as sources, NOT screenshots. Help the blind users.

5: personal rants of Big Tech CEOs like Elon Musk are unwelcome (does not include posts about their companies affecting wide range of people)

6: no advertisement posts unless verified as legitimate and non-exploitative/non-consumerist

7: crypto related posts, unless essential, are disallowed

founded 7 years ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] emergencyfood@sh.itjust.works 11 points 2 hours ago (3 children)

Maybe they are running out of electricity / data centres / some other requirement?

[–] historicaldocuments@lemmy.world 1 points 33 minutes ago

Musk: Yes, we should all slow down. With no external verification and upon the agreement of this handshake, we should all stop developing so fast. We, especially, will slow down. You can trust us.

Actually, what does that look like? I assumed from the expansions the bottleneck wasn't algorithmic, i.e. each data center that they bring online was designed from the ground up to be at 100% all the time. Is that not the case? Can you even (for lack of a better metaphor) underclock your datacenter? Does the cooling work that way?

For that matter, are they doing that trick where the datacenter is owned/operated by Independent DC Company X, and has exclusive lease agreements for compute?

[–] reallykindasorta@slrpnk.net 2 points 1 hour ago

If so it amuses me that investing in maintaining and upgrading public infrastructure via taxes might have saved them the choke point

[–] yogthos@lemmy.ml 8 points 2 hours ago (1 children)

That's also very possible. The US grid has very little spare capacity, and building out more will be a decades long project. So, if their newer models are more power hungry, then they might not be economically viable even with all the investor money being thrown at them.

[–] PriorityMotif@lemmy.world 3 points 1 hour ago (1 children)

I expect more power efficient chips that are ai specific to come out in the next few years. Eventually you'll be able to run good models on your phone. Not sure about ram requirements or anything like that if the model could be shrunk down somehow. There's definitely huge gains in optimizing efficiency to be had. Right now is the equivalent of an old IBM mainframe trying to do a spreadsheet. We might even giggle at the thought of gigabytes of ram in the future with having multiple terabytes as standard on personal devices.

[–] yogthos@lemmy.ml 3 points 1 hour ago* (last edited 1 hour ago)

I expect we'll start seeing stuff like Taalas where they print the model to the chip and other specialized chips like Xuantie C950 going forward. Neither of these requires DRAM, and Taalas is particularly clever since they just print the model right to an ASIC chip. So, the whole renting out LLMs business model isn't going to last long I suspect.